Case stories
27 July 2012
2012 Olympic Games celebrate world first dual project certification
Project certification
The 2012 Olympic Park in London is the first project to achieve dual Project Certification from PEFC and FSC.
13 March 2012
Ground-Breaking Bridport House Built from PEFC Certified Spruce Wood
Construction
Bridport House is a ground-breaking multi-storey residential complex built from cross-laminated timber (CLT). The construction of the structure took 10 weeks, which is considerably faster than the time required for a structure with a conventional concrete frame.
21 February 2012
FACIT Homes Use PEFC Certified Timber
Construction
Keen to build the house of their dreams and one with solid environmental credentials, chose the Facit Homes system to create a home with PEFC certified timber at its very heart.